Auxiliary Machine Before The Start Check List 1 - The work ticket has been terminated, the safety measures and the safety signage, the warning card has been removed. 2 - Transposition coupling protection case intact, turbo coupling at least two laps above, light moving. 3 - About the thermal control instrument of the first and second isolation valve open, the corresponding test valve, drain valve closed. 4 - Thermal control instrument power transmission, meter indication correct, interlock and protection device static calibration normal, motor-operated valve, air-operated valve, control valve calibration intact. 5 - Air-operated valve control gas source isolation valve has been opened, air-operated valve control air supply pressure is normal. 6 - DCS control screen on the equipment and valve status indication is correct, all alarm signal is correct. 7 - Close the motor-operated valve power switch, and by the open, off the test normal. 8 - Turn the bearing oil level between 1/3 ~ ...