Auxiliary Machine Before The Start Check List
2 - Transposition coupling protection case intact, turbo coupling at least two laps above, light moving.
3 - About the thermal control instrument of the first and second isolation valve open, the corresponding test valve, drain valve closed.
4 - Thermal control instrument power transmission, meter indication correct, interlock and protection device static calibration normal, motor-operated valve, air-operated valve, control valve calibration intact.
5 - Air-operated valve control gas source isolation valve has been opened, air-operated valve control air supply pressure is normal.
6 - DCS control screen on the equipment and valve status indication is correct, all alarm signal is correct.
7 - Close the motor-operated valve power switch, and by the open, off the test normal.
8 - Turn the bearing oil level between 1/3 ~ 2/3, the oil station oil level normal, oil qualified.
9 - To confirm the state of the valve in the pre-start position, exhaust the air of system、 pump body.
10 - According to the need to put auxiliary cooling water, inlet valve fully open, with the control valve to adjust the amount of cooling water.
11- Measure electrical equipment insulation, qualified after power transmission.
3 - About the thermal control instrument of the first and second isolation valve open, the corresponding test valve, drain valve closed.
4 - Thermal control instrument power transmission, meter indication correct, interlock and protection device static calibration normal, motor-operated valve, air-operated valve, control valve calibration intact.
5 - Air-operated valve control gas source isolation valve has been opened, air-operated valve control air supply pressure is normal.
6 - DCS control screen on the equipment and valve status indication is correct, all alarm signal is correct.
7 - Close the motor-operated valve power switch, and by the open, off the test normal.
8 - Turn the bearing oil level between 1/3 ~ 2/3, the oil station oil level normal, oil qualified.
9 - To confirm the state of the valve in the pre-start position, exhaust the air of system、 pump body.
10 - According to the need to put auxiliary cooling water, inlet valve fully open, with the control valve to adjust the amount of cooling water.
11- Measure electrical equipment insulation, qualified after power transmission.