Auxiliary Machine Before The Start Check

 
Auxiliary Machine Before The Start Check List


1 - The work ticket has been terminated, the safety measures and the safety signage, the warning card has been removed.
2 - Transposition coupling protection case intact, turbo coupling at least two laps above, light moving.
3 - About the thermal control instrument of the first and second isolation valve open, the corresponding test valve, drain valve closed.
4 - Thermal control instrument power transmission, meter indication correct, interlock and protection device static calibration normal, motor-operated valve, air-operated valve, control valve calibration intact.
5 - Air-operated valve control gas source isolation valve has been opened, air-operated valve control air supply pressure is normal.
6 - DCS control screen on the equipment and valve status indication is correct, all alarm signal is correct.
7 - Close the motor-operated valve power switch, and by the open, off the test normal.
8 - Turn the bearing oil level between 1/3 ~ 2/3, the oil station oil level normal, oil qualified.
9 - To confirm the state of the valve in the pre-start position, exhaust the air of  system、 pump body.
10 - According to the need to put auxiliary cooling water, inlet valve fully open, with the control valve to adjust the amount of cooling water.
11-  Measure electrical equipment insulation, qualified after power transmission.

Comments

Popular posts from this blog

What Is Pressure With Explanation

What Is Pressure With Explanation : Is usually going for you guys.  In the industry, it is also associated with the highest unit and pressure: be it a small industry, be it an ice or cement factory.  Earnings or a street house.  You will have Yashar everywhere.  It is very difficult to understand the  instruments that are broadcast without  understanding the pressure.  Pressure is considered to be the basic meter in the world of instruments. What is pressure?   In common place air pressure is called pressure.  It is given even in football.  Whether in the tire tube of small scale, motorcycle, car, etc.  And also falls into the category of pressure.  Even blowing through the mouth is considered stressful.  If you have heard.  Fill this car with 40 pounds of air.  Pound here means pound per square inch.  This is a unit of pressure.  This will be mentioned in detail.  The doctor advises some patients ...

Backwash Work Of Coal Water Treatment System

Backwash start and stop operation steps: 1 Confirm that the coal water treatment water equipment has stopped working 2 Open the slime water purifier backwash inlet valve, mud valve. 3 Start backwash pump until slime water purifier drain valve starts to drain water. 4 Stop the backwash pump, close the slime water purifier backwash inlet valve, mud valve. 5 Slowly open the backwash pump when the following three conditions, the coal slurry for back washing Coal For Water Purification 1) To purify the regular coal slurry backwash time (set 360 hours to wash once); 2) Coal slurry purifier No. 3 monitoring faucet water turbidity; 3) Water flowing through the return pipe of the coal waste water purifier. 4)The water turbidity for a long time can not meet the design requirements of water quality. Note: When the sewage pipe discharges, only the clear water is discharged, and when the sludge is not discharged, the purifier should be stopped immediately, and the purifier drain valve should be ope...

Most Important Checklist Of Work Permit Power Plants 2020

  Complete Fill Of The Working Ticket S ystem; The working ticket filling must use standard terminology, and equipment shall be indicated the name and number.  Arabic numerals (bus can use Roman numerals) are needed; Time is calculated at 24 h, year is filled in four digits, months, day, hour and minute are in digits. Working controller column: (also) the guardian, the working controller of a single task or more should be filled. Team column for A-team maintenance, the full name is filled; for several-team a comprehensive maintenance, the maintenance unit is filled. operation crew column: we should fill each staff's name for more than 10 people, we only fill in the name of 10 people,  with number (such as xxx, etc. For) other personal's  name should be into  the attached pages. The total number includes working controller, and the guardian shall be specified. Working location column: the specific location where maintenance equipment are.  Working content co...