Skip to main content

Posts

Showing posts from September, 2020

Byco Apprenticeship Program For DAE October 2020

Apprenticeship Program For Draftsman BYCO UPGRADE-I PROJECT Technical Position Eligibility Criteria For Applying Requirements :  1 - DAE Mechanical   2 - DAE Chemical Required skills :Equipment & piping Layout.  isometric Design 3D Modelling. AutoCAD and Cadworx3D. Experience : 0-1 Year Byco Jobs Fresh & Experience Candidate Can Apply  Email Your CV At:  careers@byco.com.pk Last Date For Apply: 10 October 2020

Engro Fertilizer Apprenticeship September 2020

Apprenticeship In Engro Fertilizer 2020 Trades 1 - Chemical Plant Operator 2 - Mechanical Technicians {Shop Machinist, Millwrights, Pipe Fitters, Welders} 3 - Draftsman (Mechanical) 4 - Draftsman Civil 5 - Auto Technicians 6 - Electricians 7 - Instrument Technicians 8 - Laboratory Technicians 9 - Inspection Technicians Engro Fertilizer Daharki Jobs 2020 Procedure Of Apply for Engro Fertilizer Apprenticeship Daharki Candidates attach the application a paid deposit of test fee slip of NTS. Test fee shall be paid in different  branch of HBL, UBL, MCB or ABL  bank challan. Can apply Result waited candidates  also apply Incomplete applications or received after closing date will not be qualified 

Apprenticeship Program Offering In Karachi September 2020

DAE Apprenticeship Program 2020 Must Have Candidates lives in Gulshan-e-Hadeed, Port Qasim, Landhi /Korangi, Quaida abad, would be Preferred  Education :- DAE Electrical, Mechanical, Chemical Age Limit :- 21-22 Experience:- Fresh Location "Port Qasim"  Karachi Salary :- 19,000 500 To 1000 Would be deducted for Monthly Lunch Company Benefits:- Lunch ,Pick and Drop ,Medical Note: Interested candidates may apply at sikandar.ali@primehr.com.pk

Backwash Work Of Coal Water Treatment System

Backwash start and stop operation steps: 1 Confirm that the coal water treatment water equipment has stopped working 2 Open the slime water purifier backwash inlet valve, mud valve. 3 Start backwash pump until slime water purifier drain valve starts to drain water. 4 Stop the backwash pump, close the slime water purifier backwash inlet valve, mud valve. 5 Slowly open the backwash pump when the following three conditions, the coal slurry for back washing Coal For Water Purification 1) To purify the regular coal slurry backwash time (set 360 hours to wash once); 2) Coal slurry purifier No. 3 monitoring faucet water turbidity; 3) Water flowing through the return pipe of the coal waste water purifier. 4)The water turbidity for a long time can not meet the design requirements of water quality. Note: When the sewage pipe discharges, only the clear water is discharged, and when the sludge is not discharged, the purifier should be stopped immediately, and the purifier drain valve should be ope...