Coal bunker dust collector interlock start, stop, trip conditions:
Interlocking start condition: Corresponding to the falling signal of the original coal bunker, the dust
collector is activated; the interlocking stop condition: corresponding to the lifting signal of the original coal
bunker, and the dust collector is stopped for 180s.
Roller screen interlock start, stop, trip conditions:
Interlocking start condition: coal crusher running delay 10s; interlocking stop condition: roller screen
blocking coal signal, delay 3s, roller screen interlock trip.
Coal crusher interlocking start condition:
Interlock start condition: The No.5 belt conveyor runs delay 5s.
Coal handling system sequence accident trip conditions:
Trip conditions Or):1) Start, equipment failure, sequence control stopped; 2) Belt fault trip, inverse
coal tripping of equipment; 3) Coal crusher fault trip, inverse coal tripping of equipment; 4) Roll screen: fault
trip, inverse coal tripping of equipment; 5) The chute plug protectors coal letter alarm signal, inverse coal
tripping of equipment.
Helpfull content
ReplyDelete