Coal handling system equipment interlock start, stop, trip conditions:

Coal bunker dust collector interlock start, stop, trip conditions:


Interlocking start condition: Corresponding to the falling signal of the original coal bunker, the dust
collector is activated; the interlocking stop condition: corresponding to the lifting signal of the original coal
bunker, and the dust collector is stopped for 180s.

Roller screen interlock start, stop, trip conditions:

Interlocking start condition: coal crusher running delay 10s; interlocking stop condition: roller screen
blocking coal signal, delay 3s, roller screen interlock trip.

Coal crusher interlocking start condition:

Interlock start condition: The No.5 belt conveyor runs delay 5s.

Coal handling system sequence accident trip conditions:

Trip conditions Or):1) Start, equipment failure, sequence control stopped; 2) Belt fault trip, inverse
coal tripping of equipment; 3) Coal crusher fault trip, inverse coal tripping of equipment; 4) Roll screen: fault
trip, inverse coal tripping of equipment; 5) The chute plug protectors coal letter alarm signal, inverse coal
tripping of equipment.

Comments

Post a Comment

Popular posts from this blog

What Is Pressure With Explanation

What Is Pressure With Explanation : Is usually going for you guys.  In the industry, it is also associated with the highest unit and pressure: be it a small industry, be it an ice or cement factory.  Earnings or a street house.  You will have Yashar everywhere.  It is very difficult to understand the  instruments that are broadcast without  understanding the pressure.  Pressure is considered to be the basic meter in the world of instruments. What is pressure?   In common place air pressure is called pressure.  It is given even in football.  Whether in the tire tube of small scale, motorcycle, car, etc.  And also falls into the category of pressure.  Even blowing through the mouth is considered stressful.  If you have heard.  Fill this car with 40 pounds of air.  Pound here means pound per square inch.  This is a unit of pressure.  This will be mentioned in detail.  The doctor advises some patients ...

Backwash Work Of Coal Water Treatment System

Backwash start and stop operation steps: 1 Confirm that the coal water treatment water equipment has stopped working 2 Open the slime water purifier backwash inlet valve, mud valve. 3 Start backwash pump until slime water purifier drain valve starts to drain water. 4 Stop the backwash pump, close the slime water purifier backwash inlet valve, mud valve. 5 Slowly open the backwash pump when the following three conditions, the coal slurry for back washing Coal For Water Purification 1) To purify the regular coal slurry backwash time (set 360 hours to wash once); 2) Coal slurry purifier No. 3 monitoring faucet water turbidity; 3) Water flowing through the return pipe of the coal waste water purifier. 4)The water turbidity for a long time can not meet the design requirements of water quality. Note: When the sewage pipe discharges, only the clear water is discharged, and when the sludge is not discharged, the purifier should be stopped immediately, and the purifier drain valve should be ope...

Most Important Checklist Of Work Permit Power Plants 2020

  Complete Fill Of The Working Ticket S ystem; The working ticket filling must use standard terminology, and equipment shall be indicated the name and number.  Arabic numerals (bus can use Roman numerals) are needed; Time is calculated at 24 h, year is filled in four digits, months, day, hour and minute are in digits. Working controller column: (also) the guardian, the working controller of a single task or more should be filled. Team column for A-team maintenance, the full name is filled; for several-team a comprehensive maintenance, the maintenance unit is filled. operation crew column: we should fill each staff's name for more than 10 people, we only fill in the name of 10 people,  with number (such as xxx, etc. For) other personal's  name should be into  the attached pages. The total number includes working controller, and the guardian shall be specified. Working location column: the specific location where maintenance equipment are.  Working content co...