Skip to main content

URGENTLY REQUIRED FOR BAPCO REFINERY COMMISSIONING PROJECT FOR BAHRAIN

URGENTLY REQUIRED FOR BAPCO REFINERY COMMISSIONING PROJECT BAHRAIN 

Commissioning Team                                Qualification                        Experience Required

 Pre Commissioning &                      BE Mechanical              Experience -  15years

Commissioning Manager                  BE Mechanical              Experience  - 20years

Commissioning Superintendent       BE Mechanical              Experience - 15years

Electrical Engineer                              BE Electrical                 Experience  -10years

Electrical Supervisor                            Diploma Electrical       Experience  - 7years

Sr. Technician Electrical                        Diploma Electrical       Experience  -  5years

Electrical Technician                              Diploma Electrical      Experience   - 10years

Instrument Engineer                              BE Instrumentation        Experience    - 7years

Instrument Supervisor/ Sr. Technician    Diploma Instrumentation   Experience - 5years

Instrument Technician                        Diploma Instrumentation     Experience -10years  

Telecom Engineer                                   BE Electronics                 Experience  -5years

Telecom Technician                                 Diploma Electronics       Experience -10years

Mechanical / Piping Engineer                BE Mechanical                 Experience -10years

Mechanical Static Equipment Engineer   BE Mechanical               Experience  -10years

Mechanical Rotary Equipment Engineer    BE Mechanical               Experience  -10years

Mechanical Technician Static                      Diploma Mechanical     Experience  - 5years

Rotating Equipment Technician                 Diploma Mechanical      Experience  - 5years

 

All Candidates Should have Experience in Pre-Commissioning & Commissioning in Refinery Plant Compulsory.

ATTRACATIVE SALARY PACKAGE.

FREE FOOD+ACCOMDATION+OVERTIME+MEDICAL

Suitable candidates send their update CV on below id with subject line mentioning there post

Email Address - cv@iomservices.in

INTERNATIONAL TRDAE LINK K10 Grand, 

Office No.3193rd Floor Behind Atlantic K10, Sarabhai Campus, Wadi wadi -Vadodara-390007

 Contact: 09313435828


Comments

  1. It’s great to come across a blog every once in a while that isn’t the same out of date rehashed material. Fantastic read. Best Industrial Electrician Noble Park service provider.

    ReplyDelete

  2. It’s great to come across a blog every once in a while that isn’t the same out of date rehashed material. Fantastic read.Best emergency electrician near me service provider

    ReplyDelete

Post a Comment

Popular posts from this blog

What Is Pressure With Explanation

What Is Pressure With Explanation : Is usually going for you guys.  In the industry, it is also associated with the highest unit and pressure: be it a small industry, be it an ice or cement factory.  Earnings or a street house.  You will have Yashar everywhere.  It is very difficult to understand the  instruments that are broadcast without  understanding the pressure.  Pressure is considered to be the basic meter in the world of instruments. What is pressure?   In common place air pressure is called pressure.  It is given even in football.  Whether in the tire tube of small scale, motorcycle, car, etc.  And also falls into the category of pressure.  Even blowing through the mouth is considered stressful.  If you have heard.  Fill this car with 40 pounds of air.  Pound here means pound per square inch.  This is a unit of pressure.  This will be mentioned in detail.  The doctor advises some patients ...

Backwash Work Of Coal Water Treatment System

Backwash start and stop operation steps: 1 Confirm that the coal water treatment water equipment has stopped working 2 Open the slime water purifier backwash inlet valve, mud valve. 3 Start backwash pump until slime water purifier drain valve starts to drain water. 4 Stop the backwash pump, close the slime water purifier backwash inlet valve, mud valve. 5 Slowly open the backwash pump when the following three conditions, the coal slurry for back washing Coal For Water Purification 1) To purify the regular coal slurry backwash time (set 360 hours to wash once); 2) Coal slurry purifier No. 3 monitoring faucet water turbidity; 3) Water flowing through the return pipe of the coal waste water purifier. 4)The water turbidity for a long time can not meet the design requirements of water quality. Note: When the sewage pipe discharges, only the clear water is discharged, and when the sludge is not discharged, the purifier should be stopped immediately, and the purifier drain valve should be ope...

Most Important Checklist Of Work Permit Power Plants 2020

  Complete Fill Of The Working Ticket S ystem; The working ticket filling must use standard terminology, and equipment shall be indicated the name and number.  Arabic numerals (bus can use Roman numerals) are needed; Time is calculated at 24 h, year is filled in four digits, months, day, hour and minute are in digits. Working controller column: (also) the guardian, the working controller of a single task or more should be filled. Team column for A-team maintenance, the full name is filled; for several-team a comprehensive maintenance, the maintenance unit is filled. operation crew column: we should fill each staff's name for more than 10 people, we only fill in the name of 10 people,  with number (such as xxx, etc. For) other personal's  name should be into  the attached pages. The total number includes working controller, and the guardian shall be specified. Working location column: the specific location where maintenance equipment are.  Working content co...