Skip to main content

Latest Jobs Opportunities In Pakistan Kepco KPS Lucky Coal Fired Power Plant (660MW)

 Latest Jobs Opportunities In Pakistan Kepco KPS Lucky Coal Fired Power Plant (660MW) 

Switchboard Operator 2 years of Experience Bachelor of Engineering Electrical 

Field Operator             3 years of Experience  DAE Any Field

Control Room Operator ( Coal Handling / Ash Handling ) 

 5 years of experience Bachelor of Engineering( Mech, Elect, Chem)

Efficiency / Performance Engineer  5 years of experience Bachelor of Engineering

 

                             Mechanical Department 

Supervisor - Turbine:  10 years of experience   (  DAE Mechanical )

Supervisor- Balance of Plant (BOP)   10 years of experience   (  DAE Mechanical )

Supervisor- Boiler                              10 years of experience   (  DAE Mechanical )

Supervisor- Coal Handling Plant Ash 

Handling FGD                                     10 years of experience   (  DAE Mechanical )

Multi Welder  5 years of experience

Scaffolder   Supervisor                        5 years of experience

Workshop Supervisor lath machine,

 drilling, shaping                                   5 years of experience

 Online Form Fill up

https://docs.google.com/forms/d/1MZ5jy0U2QPTdbTLITa4uMnvxAbpriMQoApxExir5IeU/viewform?edit_requested=true

Location : Port Qasim Karachi,  Pakistan 

KEPCO KPS


Comments

Popular posts from this blog

What Is Pressure With Explanation

What Is Pressure With Explanation : Is usually going for you guys.  In the industry, it is also associated with the highest unit and pressure: be it a small industry, be it an ice or cement factory.  Earnings or a street house.  You will have Yashar everywhere.  It is very difficult to understand the  instruments that are broadcast without  understanding the pressure.  Pressure is considered to be the basic meter in the world of instruments. What is pressure?   In common place air pressure is called pressure.  It is given even in football.  Whether in the tire tube of small scale, motorcycle, car, etc.  And also falls into the category of pressure.  Even blowing through the mouth is considered stressful.  If you have heard.  Fill this car with 40 pounds of air.  Pound here means pound per square inch.  This is a unit of pressure.  This will be mentioned in detail.  The doctor advises some patients ...

Backwash Work Of Coal Water Treatment System

Backwash start and stop operation steps: 1 Confirm that the coal water treatment water equipment has stopped working 2 Open the slime water purifier backwash inlet valve, mud valve. 3 Start backwash pump until slime water purifier drain valve starts to drain water. 4 Stop the backwash pump, close the slime water purifier backwash inlet valve, mud valve. 5 Slowly open the backwash pump when the following three conditions, the coal slurry for back washing Coal For Water Purification 1) To purify the regular coal slurry backwash time (set 360 hours to wash once); 2) Coal slurry purifier No. 3 monitoring faucet water turbidity; 3) Water flowing through the return pipe of the coal waste water purifier. 4)The water turbidity for a long time can not meet the design requirements of water quality. Note: When the sewage pipe discharges, only the clear water is discharged, and when the sludge is not discharged, the purifier should be stopped immediately, and the purifier drain valve should be ope...

Most Important Checklist Of Work Permit Power Plants 2020

  Complete Fill Of The Working Ticket S ystem; The working ticket filling must use standard terminology, and equipment shall be indicated the name and number.  Arabic numerals (bus can use Roman numerals) are needed; Time is calculated at 24 h, year is filled in four digits, months, day, hour and minute are in digits. Working controller column: (also) the guardian, the working controller of a single task or more should be filled. Team column for A-team maintenance, the full name is filled; for several-team a comprehensive maintenance, the maintenance unit is filled. operation crew column: we should fill each staff's name for more than 10 people, we only fill in the name of 10 people,  with number (such as xxx, etc. For) other personal's  name should be into  the attached pages. The total number includes working controller, and the guardian shall be specified. Working location column: the specific location where maintenance equipment are.  Working content co...